PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Erecting the stone panels at the East Elevation 1.jpg Erecting the stone panels at the East Elevation 2.jpg Erecting the stone panels at the East Elevation 3.jpg 2nd floor motorized dampers delivery.jpg Continued laying out block at the 1st floor sprinkler room Facing South.jpg
Next page Erecting the stone panels at the East Elevation 1
Erecting the stone panels at the East Elevation 1